• 19 Apr 21:55:23 UTC
  • Login

Sounds Of Indonesia | IDLH

Indonesian Long Haul (LH) Tour 2020

 

Indonesia, is a country that is rich in diversity, likewise in terms of music.
in this tour, you are a pilot who will deliver an orchestra group from Indonesia to conduct concerts in several countries to introduce Indonesian local songs that are packed in to Instrumental music to the presence of the world community.

 

Leg Overview

 

Indonesia Scenery Library

FS2004 (Freeware) >> Visit Page <<

FSX & P3D (Freeware) >> Visit Page <<

 

Rules

IMPORTANT : Remember you must check regularly you're connected to IVAN, to avoid problems later cause flight was done disconnected.

IDLH.R.01   All legs MUST be flown online, with "real weather".
IDLH.R.02   You are responsible to ensure that your aircraft has the range and runway performance required to conduct the leg flown. You may use medium category aircraft (commercial narrowbody jets), but it is your responsibility to choose the aircraft capable for the leg being flown.
IDLH.R.03   Maximum cruise level is FL430.
IDLH.R.04   Maximum speed is Mach 0.85 during enroute, and 250 KIAS at or below 10000ft (unless otherwise instructed by ATC).
IDLH.R.05   All legs flown must be reported in published order.
IDLH.R.06   If there's ATCs online, follow their instruction are MANDATORY, if there's no ATC online, monitor unicomm 122.800MHz all the way.
IDLH.R.07   All legs must be flown in "real time" mode 1x simulation rate. No accelerated mode is allowed, use of military and supersonic aircraft are PROHIBITED.
IDLH.R.08   A maximum of disconnection 15-20 minutes will be accepted due FS or PC crash reasons (must be stated with time in UTC).
IDLH.R.09   Please be careful while filing flight plans. Incorrect flight plans will NOT be accepted.
IDLH.R.10   Remember to report legs in UTC and 24 hours format.
IDLH.R.11   Flight Plans with Remark "RMK/IDLH" is MANDATORY.
IDLH.R.12   Before taxiing out and after parking at the gate or apron you MUST be online for a period of minimum 6 minutes.
IDLH.R.13   You must disconnect from the network after each completed leg.
IDLH.R.14   Daily leg limit is UNLIMITED.
IDLH.R.15   Since this is a long haul tour, you understand that these legs may be longer than 6 hours of flight. SANDBAGGING WILL RESULT TO PIREP REJECTION.
IDLH.R.16   Sandbaggers will be eliminated from IVAO-ID Division Long Haul Tour!.
IDLH.R.17   All ICAO codes are accepted in flightplan.
IDLH.R.18   If the flight performed in 2 different days (in UTC), flight report must use date of departure, not date of arrival.

Noncompliance with these rules will result in your leg being rejected!

Badge for completing this tour:

 

GO TO REPORT PAGE

ANY QUESTION?, WANNA SHARING PICTURES? GO TO FORUM